Project Management Consultancy Services for KG-DWN-98/2 Cluster-II Development

East Coast of India, Deep Waters (25–40 km from landfall, water depth ranging from 250m to 1450m) Adjacent to RIL’s KG-D6 field

ONGC (Oil and Natural Gas Corporation)

Scope of Work

The scope covered Project Management Consultancy (PMC) services for the entire Cluster-II development, including:

  • Review of detailed design and engineering for Subsea Production System (SPS), Subsea Umbilicals, Risers, and Flowlines (SURF), Floating Production Storage and Offloading Unit (FPSO), and onshore terminal facilities

  • Interface management for all key packages including SPS & SURF, FPSO, Central Processing Platform & Living Quarters (CPP & LQUP), drilling and completions, and onshore terminal

  • Oversight of 26 wells: 13 oil producers, 6 water injectors, and 7 deep-water gas wells

  • Close coordination with multiple EPC contractors across offshore and onshore scopes

3D Model Images

NET’s Role

As the lead partner in the PMC consortium (with Consub), Nauvata Engineering (NET) played a pivotal role in project execution:

  • Provided 90–95% of the PMC manpower, including engineering, interface, and project controls personnel

  • Maintained strong on-site supervision and coordination, including presence at the Kakinada site

  • Led technical and commercial negotiations on behalf of ONGC, especially for large change orders and claims

  • Managed all contractor interfaces across a complex, multi-party contracting setup

Current Progress

Challenges & Excellence

NET’s PMC team maintained project momentum, ensured seamless coordination, and kept project costs in check. The team successfully navigated multi-million-dollar claims while safeguarding ONGC’s interests. The achievement of First Oil on 7th January 2024 stands as a testament to the project’s resilience and NET’s effective management under pressure.